Project: Middlesex University

Supply labour and materials to install 100mm Sto Therm Classic Insulated Render System, installed to manufacturer’s details and recommendations. 

Build-Up: Substrate clean with fungal remover, prepare and prime surface and install 100mm EPS insulation boards on adhesive, Sto Armat Classic (3mm min) with embedded glass fibre mesh, Sto Silco 1.5mm top-coat.

Previous
Previous

Project: Battersea Reach

Next
Next

Project: Luton Council and Engie